Autoplay
Autocomplete
HTML5
Flash
Player
Speed
Previous Lecture
Complete and continue
Introduction to Well Completion
Section 1
1.0- Welcome to the course (3:59)
1.1 - Pre-Job Safety Meeting - Completion Operations at the rig (4:28)
1.2- Downloadable Reference Materials
1.3 - Well Preparation - Completion Operations at the rig (4:27)
Section 2
2.1 - Cement Quality Evaluation - Completion Operations at the rig (3:12)
2.2 - Sump Packer Setting - Completion Operations at the rig (1:01)
Section 3
3.1 - Well Perforation - Completion Operations at the rig (4:30)
Section 4
4.1 - Lower Completion Installation - Completion Operations at the rig (6:35)
4.2 - Preparation for Gravel Pack - Completion Operations at the rig (3:23)
4.3 - Drill String Pickling - Completion Operations at the rig (4:18)
4.4 - FRT - Completion Operations at the rig (1:43)
4.5 - CRT - Completion Operations at the rig (1:43)
4.6 - Acid Treatment - Completion Operations at the rig (2:12)
4.7 - Gravel Pack - Completion Operations at the rig (1:50)
4.8 - Reverse Out - Completion Operations at the rig (1:23)
4.9 - Post-Gravel Pack steps - Completion Operations at the rig (1:28)
Section 5
5.1 - Upper Completion Installation - Completion Operations at the rig (11:46)
Section 6
6.1 - Christmas Tree Installation - Completion Operations at the rig (9:08)
Section 7
7.1 - Good Completion Practices - Completion Operations at the rig (15:30)
Section 8
8.1 - Completion Timing - Completion Operations at the rig (1:51)
8.2- Closing (0:21)
Quiz
Quiz
Rate the course
Course Feedback
Certificate
Completion Certificate
1.2- Downloadable Reference Materials
Lecture content locked
If you're already enrolled,
you'll need to login
.
Enroll in Course to Unlock